ZJ15 Drilling Rig Solids Control System

ZJ15 Drilling Rig Solids Control System produced by Dachuan solids control have two purification stages, the first purification equipment is shale shaker and the second purification equipment is decanter centrifuge, which can remove ultra-fine solid particles efficiently. Besides, this system consists of two large mud tanks, their dimension is 7800×2450×2200mm, the wole volume is no smaller than 50m³. The subsidence structure and 360°suspension arm of the mud tanks is easy for the drilling team to move and transport.

ZJ15 Drilling Rig Solids Control System

The reason why choose decanter centrifuge instead of desander or desilter is it allows further refinement of mud solid particles. In drilling fluid circulating system, a desander can remove solid particles between 44-74μm, a desilter can remove solid particles between 15-40μm and a decanter centrifuge can efficiently separate 5-10μm ultra fine particles and at the same time recover barites in the mud, this greatly improve the drilling quality.

ZJ15 Drilling Rig Solids Control System

This system can satisfy the requirement of drilling process under 1500 meters, efficiently reduce drilling cost, convenient for the transport, movement, assemble and disassemble demand of the drilling team, greatly improve the drilling efficiency.

ZJ15 Drilling Rig Solids Control System

1500m drilling rigs are used to explore middle deep oil and coal-bed methane. Dachuan Solids Control has sold several ZJ15 solids control system to the world. If you want to get professional solution, fast response and best transportation cost, pls contact us.